Showing posts with label #electrical. Show all posts
Showing posts with label #electrical. Show all posts

Monday, March 15, 2021

Emerging from the funk

It's snowed a bit back in December. 
That's not a drift.
 It's been almost 2 months since my last blog. It's not as though nothing has happened since then, and I have a backlog of DIY home improvement updates, it's really more about a complete lack of inspiration. I think this is at least partially due to the overall malaise of a long winter and continued covid-19 restrictions. Well, the sun is out today, and despite a near zero morning low, I'm feeling like spring is in the air, and it's time to get going on this.

Before
An ongoing project this winter has been the repair of the basement floor. The main issue is where the concrete and chipped and cracked away from the cast iron sewer pipe. I've never worked with concrete before and like so many other home repair projects, it's more of an art than a technical skill. Anyone can throw concrete patch into a hole, making it look good is where the tough part is. I've used three different types of patch so far, and have found that the type of patch material use makes a big difference in the difficulty of making it look right. 


After
Even after careful application and smoothing with the trowel, I found that I needed to use a rub brick to help smooth and taper the work. That is difficult  and tiring, but helps make the finished product look better. As I have improved my technique, I have gone on the fill other cracks and holes around the basement floor. I've been using a premixed compound so whenever I have some extra time, I can work on it.

Another project I have taken on is rewiring the attic lights. This is a good job to do now before it becomes unbearably hot up there. When we bought the house, the attic lights consisted of old time cloth extension cords with bare bulbs swinging from nails pounded into the rafters. My only improvement so far has been to replace the hot incandescent bulbs with LED's. Now I am completely rewiring from the switch adding outlets and properly mounting 4 LED fixtures. It will be much safer and ridiculously bright. Three of the fixtures will have pull chains on them so we wont need to light the place up like an operating room if we don't want to.

The spooky house on Halloween.
In neighborhood news, the owner of the spooky house next door is making another run at remodeling. He's got a dumpster in the driveway, and a trio of "carpenters" from New Jersey gutting the place and apparently putting in new drywall. He asked me to keep an eye on the place since it is filed with new materials. We do and will continue to do so. I really hope he completes the place, but I've seen this all before and am definitely in wait and see mode. A project this summer may be to build a fence between our houses. This will keep people from cutting the corner from Grand Boulevard, but more importantly, clearly demarking the irregular property line and driveway ownership to anyone that rents the place, assuming it ever becomes livable. 

 



Tuesday, September 10, 2019

What a summer it was...Part 1.

Not that we did anything real exciting, but actual progress was made on several home projects. There was a price to be paid of course, and that price was the loss of a week or more of laying by a pool, eating and drinking too much. It was a fair trade however, because my lovely bride is quite happy with the progress, and our home is looking that much nicer.

Repainted porch. First do over.
There is so much to write about, I'm going to have to this in at least two parts. When I last blogged, I wrote about First Brother-In-Law Randy showing up and creating a whirlwind of brush clean up and grass planting. Little did I know that he set the pace for projects through the summer. First on the list was repainting of the porch floor, the first redo of any projects. The floor had become worn and chipped, especially near the door and on the steps. I hope this is due to the poor condition of it when I first painted, and not a job I'll have to do every three years. I hope this coat lasts longer.

Nifty location of outlet and transformer.
Looking at this reminds me to stow those
wires properly. 
Next was a major project was something I had put off for over a year. As a house "Christmas Present", we purchased outdoor lighting. I was dragging my feet on this one for a couple reasons, first was that I have no outdoor power outlets at the house. Upon reading the instructions, they want you to plug the system into a GFI outlet. When we purchased the house, we had an electrician check every outlet, and bypass the old knob and tube wiring. For reasons that are unclear to me, they also installed a GFI outlet in the basement, I think to compensate for a lack of grounded outlets through the house. Anyway, the first step was to tap into that outlet, and run power outside the house.

This brings us to the other reason why I put off the job.
Back garden lights.
Having a house with masonry construction is both a blessing and a curse. One foot thick concrete walls are definitely a curse when you are looking for was to install things outside the house. I finally decided to drill through the frame of one of the basement windows and install the outlet on the casement. This will prevent the window from opening, but I don't care.

Side house lights
Next I had to install the transformer, a rather large box that converts the power and controls the lights by timer and sensor. After that, it was time to position the lights and run the power cord. Immediately adjacent to the driveway is a concrete walk the abuts the house. Luckily there was a small gap between the house and the walk with just enough room to run the cabling. The first cable runs to the back of the house, lighting the driveway and flower bed out to the little storage area. If we ever fix the other flower bed, I left enough cable to go further.
Front walk lights and spot for flag

The other line ran down the driveway to the front of the house. We purchased these narrow little lights that I managed to install at the seams in the sidewalk, right next to the house. Further down, I dug a trench and installed two more standard lamps along the walk to the street. We also purchased a spotlight to illuminate our flag at night. This will replace the solar powered spotlight that actually worked pretty well, but didn't hold up in the long, dark winter nights.

That's it for now. The next blog will document a moment of insanity, leading to my biggest project ever.

Tuesday, February 13, 2018

Back at it

Repaired ceiling. I'm actually getting good at this. Note the
missing molding. 
With the holidays fully behind us, I have little excuse left to keep from diving back into some open projects at the house. Back in the Fall, I started after the upstairs hallway, tearing off the awful molding and some of the fixtures. It remained in that condition through Christmas, and Cindy has been beyond patient with the mess and I really need to get going on that work. First step was to repair the damaged ceiling. There were holes where the multiple smoke detectors and light fixtures hung, and where the cheap molding was attached. Next is  the big job of repairing the plaster wall that has become detached from the lathe backing. I researched the process months ago and had already purchased the needed supplies.
Holes drilled, but wall still bulging out.

I fixed the ceiling pretty quickly and decided I could no longer put off the wall repair. The first step is to drill multiple holes through the plaster in which to pump the construction adhesive. Then, you use drywall screws with big washers to pull the plaster back to the lathe, hoping that the construction adhesive bonds the two back together. This step actually went pretty well, and I pumped damn near an entire tube of adhesive into the wall. Very little oozed back out so it went somewhere, hopefully where it was needed. The drywall screws grabbed the lathe easily.

Drywall screws holding the plaster in place.
After 24 hours, you must remove the screws and hope that the plaster remains attached to the wall. Surprisingly, that's pretty much what happened. The good news is that the plaster is not longer moving back and forth in place, the bad news is that the result is an ugly mess. Some of the plaster chiped, then there are the places where a bit of the construction adhesive sticks to the washers and pulls away the plaster and paint when you remove them. So, the next step is to fill the holes and cracks with a joint compound then I will probably have to (horrors!) skim that entire wall. I've never skimmed a wall, and I'm not looking forward to it, but it is the best way to smooth out an uneven wall surface, and will look best when painted. The results of that will be in an upcoming blog.

The repaired wall. Really. Hole fix and skimming comes next.
Otherwise I did some finishing work in the bathroom. I replaced the old, industrial light fixture in the bathroom ceiling with a new, LED fixture. Of course, the previous installation did not properly install the junction box. It is just "floating" in place above the ceiling, held only by the wiring. The proper way to fix this is to go into the attic and secure the fixture to an attic floor joist. This involves moving our boxed Christmas decorations and removing the attic floor. An "easier" way would be to attach the junction box to a nearby joist, by accessing it through the hole in the bathroom ceiling. but it looks like there is nothing readily available. So, when the weather warms up, attic here I come. Of course, there is blown in insulation between the attic floor and ceiling below so that stuff will get everywhere.

In the world of upstate weather, after a brutally cold stretch in the end of December into January, the end of January and the beginning of February has been fairly benign. Not all that cold and still relatively snow free. I had been thinking that February would turn cold again, but it's been near normal so far, with a real thaw expected in the next week. I still think this winter has another brutal cold stretch in it, and I'm afraid that may mean March now, right when we are rightfully tired of winter and ready for Spring. Good news is that I understand the maple trees are being tapped and sap has begun to run. The first delicious product of Spring cannot be far away!